Monday, May 02, 2016

Proposal: Slip of Land

Reaches quorum and passes, 5-0. Enacted by Brendan.

Adminned at 03 May 2016 18:29:05 UTC

Add a subrule to “Construction” called “Indoor Coaster” as follows:

Cost: 2000
Size: 2
Effect: As part of the Local Accounting step, the processing Imagineer gains 1 SMILE per Teen or Adult Visitor that Business Day.

Add a subrule to “Construction” called “Tunnel System” as follows:

Cost: 2000
Size: 2
Effect: When this Imagineer would pay to create a new Building in a Zone they operate with a Tunnel System in it, when calculating the currency they must spend to do so, they may first divide the total Size of all other Buildings in the Zone by 2.

Add a subrule to “Construction” called “Guest Assistance Station” as follows:

Cost: 500
Size: 1
Effect: During the Local Accounting step, if there was at least one Child Visitor and one Senior Visitor that Business Day, the processing Imagineer gains 1 Smile.

Re-proposing “Sleight of Land,” except this time actually modifying the rule “Construction” instead of the rule “Buildings,” which does not exist. Sigh.

Comments

Kevan: he/him

02-05-2016 22:45:36 UTC

for

Spitemaster:

02-05-2016 23:20:28 UTC

for

IceFromHell:

02-05-2016 23:33:47 UTC

for

Larrytheturtle:

03-05-2016 00:38:51 UTC

for