Wednesday, March 28, 2012

Proposal: Will to Power

Reaches quorum and passes 10-0 ~ southpointingchariot

Adminned at 28 Mar 2012 19:47:03 UTC

Upon enactment of this proposal, all Institutions shall become Powered.

Glue in the Works enacted a good twelve hours after the start of the current Cycle, which means it wasn’t quick enough to correct the bug before the Institutions became Powered this time. This proposal will ensure that the Institutions are Powered and will have an effect, when this Cycle ends.

Comments

Bucky:

28-03-2012 13:56:26 UTC

imperial

Josh: he/they

28-03-2012 13:58:01 UTC

for

Murphy:

28-03-2012 14:05:36 UTC

for

Cpt_Koen:

28-03-2012 14:16:39 UTC

imperial I thought Institutions became Powered automatically at the end of each cycle, though

Soviet Brendon:

28-03-2012 14:19:38 UTC

imperial

Kevan: City he/him

28-03-2012 14:26:03 UTC

[Koen] The bug is that “Whenever an Institution is created or modified, it becomes Unpowered.” - when an Unpowered Institution becomes Powered, it is “modified” and therefore “becomes Unpowered”. Josh made a proposal which stopped that happening, but it didn’t enact until after the end of the last Cycle, so doesn’t have any retroactive effect. (The Cycles end after 72 hours whether or not Southpointingchariot posts to the blog about it.)

southpointingchariot:

28-03-2012 14:26:15 UTC

imperial officially confused…

Cpt_Koen:

28-03-2012 14:32:31 UTC

Oh, right. for

Clucky: he/him

28-03-2012 17:02:57 UTC

for

Patrick:

28-03-2012 21:18:23 UTC

for

Yonah:

29-03-2012 02:06:28 UTC

for

southpointingchariot:

29-03-2012 02:15:28 UTC

for COV