Monday, July 16, 2012

Proposal: Calling in the Electrician

timed out. Fails 2-2—Clucky

Adminned at 18 Jul 2012 10:44:40 UTC

Replace the following text in rule 2.2.4

If there is ever a Power Link from a Repaired Machine to a Broken Machine and that Link is not part of a Cycle, then any worker may make the Broken Machine Repaired and remove the Power Link.

with

If there is ever a Power Link from a Repaired Machine to a Broken Machine and that Link is not part of a Cycle, then any worker may make the Broken Machine Repaired.

 

Not a single machine has yet been operated. I hope this will make it at least a little more feasible to do it sooner.

Comments

Clucky: he/him

16-07-2012 04:30:05 UTC

against removing links is good. it helps prevent creating cycles as we try and power everything

kops:

16-07-2012 05:34:41 UTC

So you don’t like operating stuff?

moonroof:

16-07-2012 22:36:02 UTC

for

Bucky:

17-07-2012 03:20:38 UTC

imperial

quirck: he/him

17-07-2012 08:25:02 UTC

against

kops:

17-07-2012 18:29:10 UTC

TBH I don’t understand why this proposal isn’t a shoe-in. Can someone explain it to me?

Accidental cycles really don’t seem like a problem right now, it’s hard enough forming *any* link as it is. On the other hand, I don’t know why we bother to have the Operations rule at all because its prohibitively difficult to use right now, which is really sad because it has so much potential.

moonroof:

17-07-2012 19:35:06 UTC

I’m agreeing with you kops. Might as well repeal the operations rule if this fails.