Thursday, April 20, 2023

Proposal: Premature Inspection

Reached quorum 5 votes to 0. Enacted by Kevan.

Adminned at 21 Apr 2023 08:06:24 UTC

In “Safety Checks”, add a full stop (a period) onto the end of every step of the Inspect atomic action.

Append onto the end of the last step of the Inspect atomic action, within the same bullet, which reads

If the Build atomic action was completed in the previous step of this Inspection, and the Building is not Collapsed at the time of this completion, count the number of Gaps in the Building at that time and add this number to their Safety Checks.

the following sentence

If the number of Gaps formed throughout the Building since the most recent Moving On is exactly 1, then optionally, they may choose to gain ten times the number of Safety Checks that they originally would have gained during this step. If they choose to do so, they may not Build again while the Building Number is the same as the current one.

Inspired by Josh's early Inspection. I can see at least three reasons why this would come in handy:

  1. If Building Blocks of Safety doesn't pass, then this can give inactive but un-idle Engineers such as redtara a way get back in (granting them the ability to build on future Buildings);
  2. Saves time - someone could play safe either strategically or for whatever other reasons they may have;
  3. Reduces the number of Engineers fighting for the last few Blocks to Build during critical condition.

Comments

Brendan: he/him

20-04-2023 19:16:02 UTC

for

Josh: Observer he/they

20-04-2023 20:17:16 UTC

for

JonathanDark: he/him

20-04-2023 21:33:26 UTC

for

Lulu: she/her

20-04-2023 21:48:58 UTC

for