Monday, September 27, 2010

Proposal: Your Competition licence is up for renewal

Vetoed and failed by the Director of Operations.

Adminned at 30 Sep 2010 04:33:20 UTC

In the Rule entitled “Competition”, change the text

and the Befuddled transferred to have posted in the post describing that Competition within the previous 14 days

to

and the Befuddled transferred to have posted in the post describing that Competition

 

Comments

EvilToaster:

27-09-2010 21:31:19 UTC

imperial

Thane Q:

27-09-2010 23:47:17 UTC

imperial

Klisz:

28-09-2010 02:25:26 UTC

for

lilomar:

28-09-2010 04:11:00 UTC

imperial

Darknight: he/him

28-09-2010 04:29:34 UTC

imperial

Kevan: he/him

28-09-2010 08:30:21 UTC

against Not sure I see the advantage in changing this.

Bucky:

28-09-2010 13:58:01 UTC

Kevan: Because this way a long-running Competition doesn’t have to include contingencies for someone hitting the 14-day mark at arbitrary times.

Kevan: he/him

28-09-2010 19:04:19 UTC

for Fair enough. CoV.

Kevan: he/him

30-09-2010 11:33:00 UTC

veto Vetoed, now that we’re in the next dynasty.