Proposal: Reperpousing of Resources
Self-killed. Failed by Kevan.
Adminned at 17 Apr 2019 08:00:52 UTC
Add “Conversion” as a subrule to “Resources” with the following text
The following transactions represent changing one resource into another. At any time a contractor may spend the given amount of resources that they have on the left side of the equal sign to gain the amount of resources on the right side of the equal sign.
2 Robots + 1 Engineering = 1 Transportation
3 Robots + 1 Colonists = 2 Engineering
3 Engineering + 1 Transportation = 2 Robots
4 Colonists = 1 Biology
3 Transportation + 1 Engineering = 1 Publicity
4 Publicity = 1 Colonist
I simply made up the numbers, if they seem too low or high we can change them in a later proposal.
Kevan: he/him