Tuesday, January 18, 2022

Proposal: We Demand Novelty!

Timed out and failed, 4-6. Josh

Adminned at 20 Jan 2022 17:40:07 UTC

In the subrule “Manufacturing”, after the bulletpoint reading “Decrease the company budget by the value of the box.”, add a new bulletpoint:

- Decrease the value of the Material chosen by 0.5, to a minimum of 0.

Amend the bulletpoint reading “Choose any material from the materials table.” to the following:

- Choose any material from the materials table with a value greater than 0.

Comments

lemon: she/her

18-01-2022 17:14:20 UTC

i’d greentick this if it was a decrease by a fraction rather than a full -1 value, and it was “greater than zero” rather than “1 or greater”. i think we’ll be making a lot of boxes!

Lulu: she/her

18-01-2022 17:21:58 UTC

edited!

lemon: she/her

18-01-2022 18:01:49 UTC

oh no, i meant like, 0.5 or 0.25 instead of 1. this is worse!

Lulu: she/her

18-01-2022 19:31:25 UTC

Whoops.

Silverwing: she/her

18-01-2022 21:08:59 UTC

against

Brendan: he/him

18-01-2022 22:00:59 UTC

imperial

Zack: he/him

18-01-2022 22:01:24 UTC

against

Josh: Observer he/they

18-01-2022 22:18:03 UTC

against

Kevan: he/him

18-01-2022 22:35:10 UTC

imperial

TyGuy6:

19-01-2022 01:09:38 UTC

for

Snisbo: she/they

19-01-2022 04:34:31 UTC

against I’d prefer Denim Boxes staying supreme. Once we create the super material, then we can talk.

lemon: she/her

19-01-2022 07:00:48 UTC

for

Clucky: he/him

19-01-2022 20:29:20 UTC

for

Darknight: he/him

19-01-2022 22:07:47 UTC

imperial