Proposal: We Demand Novelty!
Timed out and failed, 4-6. Josh
Adminned at 20 Jan 2022 17:40:07 UTC
In the subrule “Manufacturing”, after the bulletpoint reading “Decrease the company budget by the value of the box.”, add a new bulletpoint:
- Decrease the value of the Material chosen by 0.5, to a minimum of 0.
Amend the bulletpoint reading “Choose any material from the materials table.” to the following:
- Choose any material from the materials table with a value greater than 0.
lemon: she/her
i’d greentick this if it was a decrease by a fraction rather than a full -1 value, and it was “greater than zero” rather than “1 or greater”. i think we’ll be making a lot of boxes!