Proposal: Planning the Ponderous
Reached quorum 5 votes to 0. Enacted by Kevan.
Adminned at 16 Apr 2019 10:55:35 UTC
Add a subrule named “Resource Ranges” the rule “Resources”:
A resource range follows the format “X-Y A”, where X and Y are numbers with X lower than Y, and A is the first letter of a resource.
When a resource range is resolved, the result is number of resources, with the resource matching the letter of the resource range and the number being randomly selected from between X and Y inclusive.
Create a rule named “Projects”:
Projects are tracked as a list in a subrule of this rule named “Project List”.
A Project has:
* a name (which is a string)
* a status (which is either dreamed, posted, contracted, or finished, and defaults to dreamed)
* an estimation (a list of resource ranges)
If a rule named “City Sites” exists, add to the list of attributes a project has:
*a location (which is a site)
naught: